Territory and Municipal Services


Temporary Road Closures

For up-to-date information on road closures due to adverse weather conditions please visit the TAMS media release page.

For up to date information please subscribe to the temporary road closure RSS feed.

For information on emergency road closures and the road resurfacing program visit TAMS Media Releases. For information on National Capital Authority (NCA) road closures visit NCA.

Notice is hereby given pursuant to Section 11 of the Public Unleased Land Act 2013, of the intention to close the following roads in the ACT.

Date / TimeSuburbLocation / Reason
6 am Monday 1 February 2016 to 6 pm Saturday 24 December 2016AmarooARMADA STREET from Pioneer Street to Mornington Street

Building construction works associated with the Amaroo Housing Project.

Notification date: 21 Jan 2016
7 am Saturday 19 September 2015 to 6 pm Friday 10 March 2017.AmarooBALGARUP STREET: Between Pioneer Street and Aberfoyle Street. PIONEER STREET: (WESTBOUND) Between Emerald Way and Katherine Avenue (access to the Service Station Driveway on Pioneer Street will remain open at all times).

Building construction works associated with the development of Blocks 1 & 2 Section 114, Amaroo

Notification date: 14 Sep 2015
7 am Monday 5 October 2015 to 6 pm Wednesday 31 August 2016.AmarooPIONEER STREET EASTBOUND DIRECTION: From the eastern side of the United Petroleum service station driveway to Emerald Way. HORSE PARK DRIVE SERVICE ROAD: From Emerald Way to Horse Park Drive.

Building construction works associated with the development of Block 3, Section 106 Amaroo.

Notification date: 29 Sep 2015
7 am Monday 18 March 2016 to 6 pm Tuesday 17 October 2017.Belconnen/ BruceSIGNALISED PEDESTRIAN CROSSING: Aikman Drive located on the northern side of Joy Cummings Place.

Construction of a new access road associated with the UC Hospital – Sub Acute project.

Notification date: 15 Mar 2016
7 am Friday 22 July 2016 to 5 pm Monday 14 November 2016.BraddonUNNAMED ROAD: Located approximately 115 metres south of Donaldson Street will be closed at Currong Street (North).

Currong Street flat demolition.

Notification date: 15 Apr 2016
7 am Thursday 26 May 2016 to 5 pm Monday 14 November 2016.BraddonCURRONG STREET (NORTH) NORTHBOUND DIRECTION: From Batman Street to the unnamed lane way located approximately 115 metres south of Donaldson Street

Currong Street flat demolition.

Notification date: 15 Apr 2016
6 am Monday 7 September 2015 to 8 pm Wednesday 7 September 2016CAMPBELLPROVAN STREET: Between ANZAC Park East and Pentland Street

Building construction works associated with the development of Block 8 Section 5 and Block 1 Section 130, Campbell.

Notification date: 31 Aug 2015
6 am Monday 15 February 2016 to 8 pm Wednesday 1 February 2017.CampbellPENTLAND STREET: Between Anzac Park East and Provan Street.

Building construction works associated with the development of Block 8 Section 5 and Block 1 Section 130, Campbell.

Notification date: 11 Feb 2016
6 am – 6 pm (daily) Monday to Saturday on periodic days as required from Tuesday 21 June 2016 to Saturday 24 December 2016.CampbellANZAC PARK EAST BOTH DIRECTIONS: Between Constitution Avenue and Page Street.

Concrete pours associated with the development of Block 1, Section 130 Campbell.

Notification date: 10 Jun 2016

8 pm Sunday 3 July 2016 to 5 am Monday 4 July 2016 - 8 pm Monday 4 July 2016 to 5 am Tuesday 5 July 2016

8 pm Sunday 10 July 2016 to 5 am Monday 11 July 2016 - 8 pm Monday 11 July 2016 to 5 am Tuesday 12 July 2016.

City / Reid

CONSTITUTION AVENUE BOTH DIRECTIONS: From Anzac Park West to Allara Street.

CORANDERRK STREET BOTH DIRECTIONS: From Parkes Way to Amaroo Street.

(Access to local business and residents will maintained).



Asphalt resurfacing of the Constitution Avenue / Coranderrk Street intersection.

Notification date: 24 Jun 2016
7 pm – 12 midnight on periodic nights as required Monday to Thursday from Monday 9 May 2016 to Thursday 4 August 2016.DicksonDICKSON PLACE (BOTH DIRECTIONS): From the eastern side of The Dickson Tradies Club car park to Cowper Street.

Civil works associated with the Dickson Place – Cowper Street intersection upgrade project.

Notification date: 29 Apr 2016

9.30 am – 4 pm Monday to Friday 7 am – 5 pm Saturday’s From Monday 9 May 2016 to Saturday 13 August 2016.

FranklinFLEMINGTON ROAD SERVICE ROAD: From Clare Burton Crescent (northern end) to Flemington Road.

Modifications to Flemington Road service road.

Notification date: 02 May 2016
7 am Thursday 25 February 2016 to 5 pm Friday 30 September 2016.FranklinMANNING CLARK CRESCENT: Northbound lane between Barbara Jefferis Street and Flemington Road.

Building construction works associated with the Valley Avenue and Manning Clark intersection upgrade.

Notification date: 18 Feb 2016
Will be closed on periodic days between 7 am to 6 pm Monday to Saturday, from Tuesday 8 December 2015 to Friday 13 January 2017.FranklinFLEMINGTON ROAD SERVICE ROAD: From Knorr Street to Flemington Road.

Building construction works associated with the development of Block 2, Section 33 Franklin.

Notification date: 01 Dec 2015
7 am Monday 4 July 2016 to 5 pm Wednesday 6 July 2016.FranklinCHRISTINA STEAD STREET BOTH DIRECTIONS: From Nullarbor Avenue to Marvis Latham Street.

Road works associated with construction of new water service.

Notification date: 22 Jun 2016
7 am Wednesday 15 June 2016 to 5 pm Friday 30 September 2016.FranklinMANNING CLARK CRESCENT (BOTH DIRECTIONS): From Flemington Road to Barbara Jefferis Street.

Roadworks associated with the Gungahlin Town Centre East roads project.

Notification date: 08 Jun 2016
From 5pm Thursday 30 June 2016 to 5 pm Tuesday 30 August 2016.Garran

HOSPITAL ROAD SOUTHBOUND DIRECTION ONLY:From Gilmore Crescent to Bateson Road.

PEDESTRIAN CROSSING: Located on the northern side of the Canberra Hospital main entrance roundabout.



Installation of underground services.

Notification date: 21 Jun 2016
5 pm Sunday 21 February 2016 to 5 pm Thursday 30 June 2016.GarranHOSPITAL ROAD SOUTHBOUND DIRECTION ONLY: From Gilmore Crescent to Bateson Road.

Installation of underground services.

Notification date: 11 Feb 2016
Will be closed on periodic days between the hours of 7 am Tuesday 23 February 2016 to 5 pm Saturday 31 December 2016.GordonSTURROCK PLACE: Between Sawicki Place and Van Praag Place.

Building construction works associated Block 6, Section 527 Gordon.

Notification date: 16 Feb 2016
6 am Tuesday 2 February 2016 to5 pm Saturday 24 December 2016GreenwayCYNTHEA TEAGUE CRESCENT: from Oakden Street to Anketell Street (north). OAKDEN STREET: eastern side from Anketell Street to Cynthea Teague. LIMBURG WAY: from Anketell Street to 110m east of Anketell Street

Building construction works associated with the development of multiple blocks in Greenway.

Notification date: 21 Jan 2016
7 am Tuesday 1 March 2016 to 5 pm Friday 30 June 2017.GriffithTHROSBY LANE: A section of Throsby Lane will be closed behind the Griffith Butchery and Griffith Pharmacy.

Building construction associated with the Griffith Butchery refurbishment.

Notification date: 23 Feb 2016
7 am – 6 pm (daily) Monday to Friday on periodic days as required from Monday 9 May 2016 to Wednesday 30 November 2016.Gungahlin ERNEST CAVANAGH STREET BOTH DIRECTIONS: From Boon Lane to Gozzard Street.

Works associated with The Marketplace Gungahlin redevelopment.

Notification date: 15 Apr 2016
7 am – 6 pm (daily) Monday to Saturday on periodic days as required from Monday 18 April 2016 to 6 pm Friday 22 July 2016.GungahlinERNEST CAVANAGH STREET WESTERN DIRECTION: From Boon Lane to Gozzard Street.

Works associated with The Marketplace Gungahlin redevelopment.

Notification date: 31 Mar 2016
From 5 pm Thursday 30 June 2016 to 5 pm Wednesday 24 August 2016.HoltHARDWICK CRESCENT BOTH DIRECTIONS: From the main entrance to the Magpies Sports Club to approximately 50 metres south of the Magpies Sports Club.

Installation of underground services associated with the development of Block 67, Section 51 Holt.

Notification date: 20 Apr 2016
5 pm Friday 10 June 2016 to 5 pm Thursday 28 July 2016.Kingston

WENTWORTH AVENUE SOUTHBOUND DIRECTION: Right turn lane into Giles Street will be closed.

WENTWORTH AVENUE NORTHBOUND DIRECTION: Right turn lane into Giles Street will be closed.

WENTWORTH AVENUE CENTRE MEDIAN: Will be closed at the Giles Street intersection.

WENTWORTH AVENUE CENTRE MEDIAN: Will be closed at the Gosse Street intersection.



Wentworth Avenue Rehabilitation Works, Stage 3.

Notification date: 01 Jun 2016
From 6 pm Thursday 24 December 2015 to 5 pm Saturday 24 December 2016.KingstonHONEYSETT VIEW: Between the rowing club entrance to Eyre Street. KERRIDGE STREET: Between The Causeway and Honeysett View.

Building construction works associated with the development of Blocks 1, 2 & 3, Section 65 and Blocks 1, 2, 3, 4 & 5, Section 66 Kingston.

Notification date: 12 Oct 2015
7 am Thursday 30 June 2016 to 5 pm Monday 25 July 2016.KingstonGOSSE STREET BOTH DIRECTIONS: From approximately 40 metres west of Wentworth Avenue to Wentworth Avenue. GILES STREET BOTH DIRECTIONS: From the driveway at number 47 Giles Street to Wentworth Avenue.

Wentworth Avenue Rehabilitation Works, Stage 4.

Notification date: 05 May 2016
7 am Monday 6 June 2016 to 5 pm Friday 10 June 2016.Majura (Rural)MAJURA PARKWAY (SOUTHBOUND DIRECTIONS): Hughie Edwards VC RAAF Memorial Grove rest area will be closed.

Road works associated with the Federal Highway truck inspection lay-bys project. .

Notification date: 26 May 2016
7 am Monday 20 June 2016 to 5 pm Friday 1 July 2016.Majura (Rural)MAJURA PARKWAY (SOUTHBOUND DIRECTIONS): Hughie Edwards VC RAAF Memorial Grove rest area will be closed.

Road works associated with the Federal Highway truck inspection lay-bys project.

Notification date: 10 Jun 2016
6 am - 6 pm Monday to Friday and 8 am - 6 pm Saturdays on periodic days as required. From Monday 30 May 2016 to Saturday 24 December 2016.MoncrieffBON SCOTT CRESCENT (BOTH DIRECTIONS): At either end of Coetmore Lane.

Building construction works associated with the development of Block 1, Section 27 and 28 Moncrieff.

Notification date: 19 May 2016
7 am Thursday 28 January 2016 to 5 pm Thursday 30 June 2016.PhillipCORINNA STREET BOTH DIRECTIONS:From the western driveway of the Woden Senior Citizens Club to Melrose Drive.

Civil works associated with the Furzer Street precinct and Melrose Drive intersections project.

Notification date: 20 Jan 2016
7 am Monday 13 June 2016 to 5 pm Thursday 22 July 2016.PhillipSURPRIZE PLACE (BOTH DIRECTIONS): From approximately 75 meters west of Easty Street to the end of Suprize Place.

Installation of underground service

Notification date: 06 Jun 2016
Saturday 4 June 2016 until further noticeRuralSunshine Crossing

Wet weather

Notification date: 06 Jun 2016
Saturday 4 June 2016 until further noticeRuralAngle Crossing

Wet weather

Notification date: 06 Jun 2016
Sunday 5 June 2016 until further noticeRuralUnsealed section of Boboyan Road (closed to all vehicles except four wheel drives)

Wet weather

Notification date: 06 Jun 2016
RuralMount Franklin Road at Bulls Head

Wet weather

Notification date: 24 Jun 2016
RuralWarks Road

Wet weather

Notification date: 24 Jun 2016
From 10.00 am to 14.30 pm on Friday 1 July 2016.TharwaNORTH STREET between Union Street and Tharwa Drive.

U19 Australian Road Race Championships.

Notification date: 26 Apr 2016
From 8.30 am to 4.30 pm on Saturday 2 July 2016.Tharwa / Gordon / RuralNORTH STREET between Union Street and Tharwa Drive/Naas Road.

U19 Australian Road Race Championships 2016.

Notification date: 27 Jun 2016
From 8.00 am to 5.00 pm on Saturday 17 September 2016.Watson / ParkesWENDOUREE DRIVE between Kings Avenue and the foot path crossing Wendouree Drive at Kings Park.

Wall to Wall Ride for Remembrance.

Notification date: 07 Jun 2016
From 2.00 pm to 3.45 pm on Saturday 17 September 2016.Watson / ParkesFEDERAL HIGHWAY Southbound lane between Antill Street and Flemington Road.

Wall to Wall Ride for Remembrance.

Notification date: 07 Jun 2016
4 pm to 9 pm on Saturday 29 October 2016Yarralumla

KAYE PLACE at the intersection with Flynn Drive.

KAYE STREET between Commonwealth Avenue and Flynn Drive.



Canberra Nara Candle Festival.

Notification date: 15 Jun 2016

Barriers, warning and diversion signs to be erected on site. For more information contact Access Canberra on 13 22 81.

The ACT Government is committed to improving the accessibility of web content. To provide feedback or request an accessible version of a document please contact us or phone 13 22 81.
Bookmark and Share

Feedback | Languages | Sitemap | Jobs ACT | Privacy | Disclaimer | Copyright Page last updated on 17 March 2016